Monument digitally printed building wrap in London
One of Pyramid largest projects in March was a building wrap for the world-renowned Monument. The Monument was completed in 1677 by Sir Christopher Wren to commemorate the Great fire of London.The Monument is the tallest isolated stone column in the world. Presently, an extensive refurbishment is underway on the Monument and Pyramid was asked to undertake a building wrap to visually enhance the work area.The digitially printed mesh wrap incorporates three sides of the Monument, reaching a total size of 45m wide by 30m high. In order to reach such mammoth sizes we hot air weld 5m strips together to form large sections and then attach the sections to the scaffolding using eyelets and fish tails, thus creating the required result. For more infomation please visit http://www.pyramidvisuals.com/services/building_wrap