Manchester Bridge entered for Prestigious Award

26/05/2020

Manchester Bridge Nominated for Prestigious Award A Grade II listed structure, built in the 1890's, Underbridge 94a carries two busy railway lines over Castle Street in the heart of the city centre on their way into Manchester Picadilly station. Of cast iron construction and with a lead based protective coating applied over 25 years ago the bridge was in urgent need of refurbishment. The brief given to Supablast Nationwide was to strip off the old lead based paint, repair the iron work and apply a visually attractive protective coating system that would see the bridge restored to its former glory. Sounds simple enough, but Underbridge 94a presented Supablast with a number of challenges.The 12 week programme ran from February to April 2008. Located on the corner of Deansgate next to the popular Cafe Bar, it was imperative that every precaution was taken to protect the public and their property, whilst maintaining pedestrian access at all times. With the exception of a single weekend, partial vehicular access also had to be maintained for the duration of the contract. This meant the ends of the bridge were accessible, but that all the work on the middle of the bridge had to be completed during a single 54 hour full road closure. Working a continuous rolling shift pattern a full enclosure and scaffolding was erected, the bridge structure was blast cleaned to SA2½ standard by a fully trained Supablast team, made good, primed and painted before everything was taken down again and cleaned using a street cleaning machine, ready for Monday morning. Work on trackside was undertaken over 4 weekend possession periods. In addition to the blast cleaning and painting, Supablast also undertook extensive steel work repairs replacing over 200 damaged bolts and all the cast iron guttering and brackets. This being a cast iron structure, particularly susceptible to pitting meant that the whole structure had to be made good by filling the pits with Sidukar 31. As can be seen from the picture below, the iron work was finished in a 3 colour XM92 protective coating system (as approved by Network Rail) applied in 4 coats and all the abutments were high pressure jet washed.As anyone who works on the railway infrastructure will know, health and safety management is at the forefront of everyone's thinking, this coupled with the close proximity of the public, the inclement February weather and the complexity of the job (particularly the underside of the bridge) meant that Supablast employees and management had to be on the top of their game to ensure that this project was completed safely, on time and on budget. Jan Prowse, Managing Director of Supablast Nationwide was rightly proud of the refurbishment: “As a company we pride ourselves on our attention to detail and take a lot of satisfaction from a job well done. We have received some very positive comments from the general public who are pleased that we have replaced something of an eye sore with a structure that is now noticed for all the right reasons”. The refurbishment of Underbridge 94a, has been nominated for the Institute of Civil Engineers Historic Bridge Infrastructure Awards 2008. In its eleventh year, the purpose of the awards is “to promote and celebrate excellence and innovation in the conservation of transport – related structures which are over 30 years old”. Supablast have high hopes, but will have to wait until the awards ceremony on the 13th November to find out if they have been successful. For further information on Supablast Nationwide and the services they offer please contact them on Tel. 01675 464446, e-mail enquiries@supablast.co.uk or visit their website at www.supablast.co.uk