Nuclear waste handling projuect

01/01/1970

This scissor lift table was supplied to the Nuclear Industry as part of a waste handling project.  As the facility was built over the lift once it had been installed it was a requirement that the lift had a 10 year minimum life span without major parts needing to be replaced.  The lift carried a 14 tonne fork lift in any position.