Major roof slip repairs

01/01/1970

Called out to an emergency roof slip problem, The client noticed brickwork displacement at the rear elevation adjacent to the eves, We got an architect involved who designed a steel ridge beam to hold up the ridge of the roof to prevent it moving further, we had the steel structure made up and installed within 5 days of the call, and then carried out further structural steel strapping between the joists and the purling's, this stopped the roof from slipping any further, Once that was complete we erected a rig and started the process of removing the displaced brickwork, gutter and  facia etc, We then rebuild the brick work to the rear elevation and completed the project with new Upvc facia and guttering,Contact us to be directed to our main site for reviews and picture.