S&A Contractors Bathrooms

07/06/2020

Removal and disposal of your old bathroom suite. Removal and disposal of your existing wall and floor tiles and coverings. Plastering of your walls and ceilings including coving. Installation of your new bathroom suite. Installation of baths. Installation of shower enclosures. Installation of showers, gravity, power or electric. Installation of downlights, extractor fans and shaver sockets. Installation of mirrors with lights. Installation of wet rooms. Removal of stud or brick walls and doorways. Erection of new stud walls including new doorways and door hanging. Full wall and floor tiling including heated floors