Gunfleet Sands
155 Tower Street, CO7 0AW
Brightlingsea, Essex
Business profile
Gunfleet Sands Offshore Wind Farm consists of two phases, Gunfleet Sands 1 with 30 turbines and Gunfleet Sands 2 with 18 turbines Gunfleet Sands 1 consists of 30 turbines each of 3.6MW and Gunfleet Sands 2 consists of 18 turbines each with a capacity of 3.6MW The Gunfleet Sands offshore wind farm was constructed by DONG Energy, and September 2011 Marubeni Corporation acquired a 49.9% stake in the 172MW wind farm The construction phase for the total project comprising Gunfleet Sands 1 and 2 commenced in September 2008 Our business is based on procuring, producing, distributing and trading in energy and related products in Northern Europe