Bridges

01/01/1970

 Faced with a small budget, difficult access, and the requirement for a 'vandal-proof' bridge FLI designed an innovative steel structure to span 9.4m across a river in The Brecon Beacons National Park in South Wales. The footbridge was a bespoke project for The Forestry Commission and was completed in June 2006. We can recreate the same quality in design and provide bridge solutions for awkward sites.