Building wraps , Scaffolding banners, Large building wrap
The Tate Britain's has had a £45m makeover claiming it 'will make it London's finest gallery' Tate Britain has had a multi-million pound refurbishment to ensure it is stays as one of the country's "finest" galleries. Unfortunately some of the gallery will be closed for the 2012 London Olympics. So not to disappoint visitors coming to see the gallery, which during the renovation would be under a scaffolding structure a large building wrap was needed to hide the unattractive scaffolding. The Tate Britain ran a competition for artists to come up with designs and the winners would have their artwork printed onto the building wrap. The scaffolding structure was deep due to the support needed for the roof scaffolding making the windloads onto the building wrap abnormally high. This is due to the wind coming from both the front and rear of the building wrap putting huge pressure across the fixing points and the scaffolding structure. To mitigate this additional reinforcing supports were heat welded into the mesh building wrap both horizontally and vertically so the windload is absorbed across the whole of the structure.